NEWS & CONSTRUCTION KNOWLEDGE
Knowledge for better construction decisions.
Detailed guides, real project photographs and clearly identified company news about renovation, building systems and construction planning.Latest articlesUp to date
The latest from Smart Bau Group.
Protect buildings against heavy rain: assess water routes and entry points in existing propertiesPlan heavy-rain protection for existing buildings: review maps, terrain, entry points, backflow, drainage and protective measures for the house and plot.
8 Min. reading time
Glued or floating parquet: choose installation from the existing conditionsGlued or floating parquet? Compare substrate, build-up height, acoustics, underfloor heating, repairs and removal in existing rooms.
8 Min. reading time
Parquet on existing underfloor heating: assess the whole construction before approvalPlan parquet over existing underfloor heating: check heating system, screed, moisture, thermal transmission, installation, indoor climate and commissioning.
7 Min. reading time
Renovate or replace parquet: derive the right measure from existing conditionsRenovate or replace parquet: assess construction, finish, loose areas, moisture and damage, and distinguish care, repairs, sanding and replacement.
7 Min. reading time
Ventilation in existing bathrooms: plan moisture removal before renovationPlan ventilation in existing bathrooms: assess exhaust routes, replacement air, controls, moisture, heat and functional checks before renovation.
6 Min. reading time
Renovate a terrace: plan water routes, falls and junctions before the tilesRenovate an existing terrace: check levels, falls, drains, thresholds, edges and heavy-rain routes before choosing materials.
6 Min. reading time
Herringbone parquet in existing buildings: assess the substrate before setting the axisPlan herringbone parquet in existing buildings: check substrate, moisture, height, underfloor heating, junctions and laying axis before ordering.
6 Min. reading time
Use GEAK Plus properly: turn renovation options into a feasible sequenceUse GEAK Plus properly: combine renovation options with condition, use, budget and construction for a reliable sequence.
6 Min. reading time
Heating replacement in Aargau and Zurich: assess the building before choosing the systemHeating replacement in existing buildings: assess heat demand, distribution, space, noise, permissions and subsidies before a quotation.
7 Min. reading time
Kitchen renovation in existing buildings: technical decisions required before orderingRenovating an existing kitchen: coordinate measurements, water, electrics, extraction, appliances and flooring before orders and quotations.
7 Min. reading time
Asbestos before renovation: what owners must clarify before removalPre-1990 buildings must be checked for asbestos before alterations and removal. Prepare scope, sampling, quotations and sequencing correctly.
6 Min. reading time
Replacing a bath with a level-access shower: what to check in an existing buildingWhen can a bath be replaced with a level-access shower? This guide explains drainage height, falls, waterproofing, glass and quotations.
6 Min. reading timeKnowledge topics
Go straight to the right topic.

Bathroom refurbishment
Understand costs, pipework, waterproofing, tiles and the process.
Open area
Kitchen
Plan the layout, appliances, water, electrical systems, ventilation and lighting together.
Open area
Flooring
Choose the right material, substrate, floor construction, joints and transitions.
Open area
Building services
Coordinate plumbing, heating, electrical systems and smart home features early.
Open area
New build & renovation
Manage the existing building, construction process, costs and interfaces as one system.
Open area
6S Construction System
Assess location, building fabric, strategy and documentation together.
Open areaPROJECT CHECK
